Construction of the new William S. Richardson School of Law.

Work includes Specific Inclusions: Site Concrete •Furnish and install all forming, concrete, concrete finishing and placement, vertical curb, curb and gutter, 2 foot valley gutter, H type B wall C&C standard R-31, 4” concrete paving, trash enclosure with 6’’ concrete paving, ramps and CIP- stairs. •Furnish and install ADA ramps per plan •Specific Inclusions: CIP Concrete •Furnish and install formwork for footings, columns, beams, and interior perimeter curbs •Furnish and install rebar templates for precast walls and columns.

2485 Dole Street
Honolulu, HI 96822
United States