Architectural and Structural Concrete

Maple Street Correctional Center

Redwood City, CA

Owner: County of San Mateo

Project Description:

New construction of a 260,000GSF correctional facility on a 4.67-acre site with surface parking, central plant, and offsite improvements.    The site concrete scope included concrete walkways at building perimeter, offsite sidewalk, concrete pavement at central utility plant, curb and gutter, and concrete bioswales. The structural concrete scope included: radiant concrete floor at Level 2 & Level 3. This project achieved LEED-Gold certification. 

Featured Projects